Technical Article

Minimizing Flow-Assurance Issues With Cost-Effective MEG Regeneration And Reclamation Technology

Thumb_Technical Article - Minimizing Flow-Assurance Issues with cost-effective MEG reg_1

For ENI's JANGKRIK Project, PROSERNAT was awarded in 2014 for the design and supply of an intergrated monoethylene gycol regeneration and reclamation module, to be installed onto a FPU located pffshore Borneo in Indonesia.

Fill in the form to download this technical article

You might be interested

Crude-to-Chemicals (CTC): a straight-forward route for a strategic turn

Crude-to-Chemicals (CTC): a straight-forward route for a strategic turn

Renewable Transportation Fuels - a U.S. Focus

Renewable Transportation Fuels - a U.S. Focus

Specific Surface Area Stability: a Key to Prolonged Optimum Performance from Naphtha Reforming Catalyst

Specific Surface Area Stability: a Key to Prolonged Optimum Performance from Naphtha Reforming Catalyst